Managing the logistics arising through the introduction of larger aircraft along with the need to update and improve the existing terminal building and carpark were the key brief requirements for this project.
Through assessing the movement of passengers and the management of baggage we arrived at a design solution that incorporated separate entrance and exits. These formed the basis for the re-design of the building façade and internal organisation of the spaces.